If you have any questions, please email us to  plantview@conteks.com.sg .


Table of Contents

  1. Operation environment
  2. Implementation Steps
  3. Machine Connections
  4. Installation Lead Time
  5. Can print out Gant chart?
  6. What is maximum number of machine could connect to the system?

Operating Environment?

The official operating environments for PlantView are as follows:

Back to Top

Implementation Steps

  1. Site survey
  2. Quote lead time and cost
  3. Contract
  4. Electrical installation
  5. Electrical test
  6. Actual running test
  7. Handover
Back to Top

Machine Connection

1. Digital input (on/off)

2. Ethernet or Serial Communication

Back to Top

Lead Time

2-3 month including of electrical installation

Back to Top

Can print Gant chart?

Yes.

Back to Top

Maximum No. of machine

Theoretically, maximum input is about 8000 points. Let say if you connect machine per point, it will be 8000 machines. But practically (considering of hardware capacity), it is good that  PCs be distributed.

Back to Top


Copyright © 1999  Conteks Fa Pte Ltd. All rights reserved.
Revised: May 01, 2002 .